We got to start on plumbing last week.

An assortment of fittings. 45's, 90's , couplers, tee's, reducers, and more.

Drains and vents from above.

Here it is from below.








When we poured the footings, the concrete was poured directly from the truck to the form. In this situation, the concrete is poured into a pump, which you can see on the left. The pump pushes the concrete through a tube and then into the block wall. Every cell needs to be vibrated to make sure there are no air pockets. The rebar leaning against the wall gets stabbed into the freshly poured grout every four feet.
There it is, freshly grouted stemwall. We poured about 39 yards of concrete that morning. The grey conduit with the yellow tape on it is for our electrical outlets, these were put in the night before. There was a lot of cleanup to get the grout off the side of the walls and level. All of this had to be done before the concrete got too hard. Overall things went very well. Just a fun fact, at this point, I estimate our house to weigh close to 450,000 lbs!
The first course is coming together here. My job was to bring all the block off the pallets to the interior. We hired professional block layers to set the block.
This is the finished height of the stem wall. It looks taller now than it will after we backfill. Our floor will sit at this level. You can see vents in the wall here, this is for a passive cooling system. I'll get into the details of this in a future post.
It was an early morning. The first truck showed up at 4:45 am. They were pouring 10 min later. The excavator is just there for the lights.
It was a big scene that morning. We have been doing our best to keep the construction traffic localized to the immediate area around the building site to limit the damage caused by such massive equipment. To be honest, I am quite pleased with the results so far.
Here is the inspector performing a "Slump test." He filled the cone with concrete then removed the cone. Next he measured how far down the concrete fell in relation to the top of the cone. Our concrete fell 3.5 inches. This was good and we passed the test. Over 4 inches and we would have failed.
These cylinders are another test. They are filled with concrete and broken on 7, 14, 21, and 28 days after pouring to test the strength. The concrete we poured was 3000 psi. Everyone on site was confident that it would test stronger than that.